文章信息/Info

Title:
Research and application on the constant tension ship-blocking facilities adapt to the change of water level
文章编号:
1007-7839(2019)08-0066-03
作者:
周和平1 周建方1 夏 炎2
1.江苏省洪泽湖水利工程管理处, 江苏 淮安 223100; 2.江苏省淮沭新河管理处, 江苏 淮安 223005
Author(s):
ZHOU Heping1 ZHOU Jianfang1 XIA Yan2
1.The Hongze Lake Water Conservancy Project Management Office of Jiangsu Province, Huai'an 223100, Jiangsu; 2.The New Huaishu River Management Division of Jiangsu Province, Huaian 223005, Jiangsu
关键词:
工程管理 拦船设施 张紧装置 水流力
Keywords:
engineering management ship-blocking facilities tension device water current force
分类号:
TV131.2+9
文献标志码:
B
摘要:
为使拦船设施适应水位变化,研究采取以下措施:一是选择在设计低水位时安装拦船设施,选配适当体积和重量的浮筒,调整钢丝绳到水面的间距以适合拦阻船舶; 二是在设计低水位时两岸水边的2只浮筒下加大配重,安装时收紧钢丝绳,分配适当重量由钢丝绳承担,使钢丝绳内具有设计张力; 三是引入由底板、构架、钢丝绳、滑轮组、吊锤、导向钢管等组成的张拉系统,其中钢丝绳一头连着设计低水位时拦船设施水边的浮筒,另一头通过3个滑轮连接吊锤。前两项措施保证拦船设施在设计低水位下正常发挥拦船功效,第三项措施保证水位上涨后,张拉系统吸收拦船设施富余钢丝绳,并以几乎恒定的拉力使拦船设施钢丝绳处于张紧状态,发挥拦阻船舶作用。安装时通过调整钢丝绳长度、浮筒配重、吊锤重量等措施,使拦船设施在任何水位下均满足设计要求。
Abstract:
In order to adapt the ship-blocking facilities to the changes of water level, the following three measures were taken: First, installing ship-blocking facilities at lowest design water level, selecting the buoys of appropriate volume and weight, adjusting the distance between wire rope and water surface to be suitable for blocking ships; Second, increasing the counterweight of two buoys at both sides of the river under lowest design water level, tightening the wire rope when installing, and assigning appropriate weight borne by the wire rope, so as to make the wire rope bear the design tension; Third, a tensed-tension system composed of bottom plate, frame, wire rope, pulley block, hanging hammer, guiding steel pipe, etc. was introduced. One end of the wire rope was connected to the buoy at the water side of the ship blocking facility at the lowest design water level, and the other end was connected to the hanging hammer through three pulleys. The first two measures ensured the normal function of the ship-blocking facilities at lowest design water level. The third measure ensured that after the water level rose, the tension system absorbs the surplus steel wire rope of the ship-blocking facilities and tensioned the steel wire rope with almost constant tension to play the role of blocking ships. When installation, by adjusting the length of wire rope, the counterweight of buoys and the weight of hanging hammers, the ship-blocking facilities could meet the design requirements at any water level.

参考文献/References:

[1] 陈国虞, 倪步友, 张澄, 等. 跨海湾(河湾)桥梁非通航孔柔性拦船防撞装置[J]. 广东造船, 2011(1):31-41.
[2] 谢远宏, 李志忠. 杭州湾跨海大桥非通航孔桥船舶拦截体系施工技术[J]. 施工技术, 2011(3):1-4.
[3] 周和平, 李璟. 运东闸上游拦船设施改造方案简析[J]. 水利水电科技进展, 2001(12):52-53.
[4] 孙猛, 周和平, 严凯. 后置式拦船设施的动力学分析与工程应用[J]. 扬州大学学报, 2014, 35(2):24-28.
[5] 钱福军, 周和平, 夏卫中. 长江感潮段闸站工程摩阻型拦船设施应用[J]. 排灌机械工程学报, 2016(4):313-320.
[6] 周和平, 李欣, 陆美凝. 三河闸摩阻型拦船设施应用研究[J]. 江苏水利, 2017(12):31-36.
[7] 邹明. 英国曼彻斯特运河船闸的拦船装置[J]. 水运工程, 1979(3):48.
[8] 饶建江, 胡涛勇, 任涛, 等. 苏州河河口水闸水上安全防撞设施设计[J]. 水利水电科技进展, 2007(1):79-81.

相似文献/References:

[1]葛 忆,周贵宝,邵园园,等.江苏水库基本特征分析[J].江苏水利,2018,(07):69.
 GE Yi,ZHOU Guibao,SHAO Yuanyuan,et al.Analysis on the basic characteristics of Jiangsu reservoir[J].JIANGSU WATER RESOURCES,2018,(08):69.
[2]胡有云,刘红伟,陈运杰,等.太湖地区防汛抗洪工作的实践与思考[J].江苏水利,2021,(08):67.
 HU Youyun,LIU Hongwei,CHEN Yunjie,et al.Practice and thinking of flood control and flood fighting in Taihu Lake region[J].JIANGSU WATER RESOURCES,2021,(08):67.
[3]闵克祥,何琴,顾昊,等.“一河两湖”流域防洪和生态安全探索实践[J].江苏水利,2022,(增刊1):63.
 MIN Keqiang,HE Qin,GU Hao,et al.Exploration and practice of flood control and ecological safety in“One River and Two Lakes”watershed[J].JIANGSU WATER RESOURCES,2022,(08):63.

备注/Memo

备注/Memo:
收稿日期:2019-05-13
作者简介:周和平(1964-),男,本科,研究员级高级工程师,主要从事水利工程管理工作。
更新日期/Last Update: 2019-08-15