参考文献/References:
[1] 艾克明. 台阶式泄槽溢洪道的水力特性和设计应用 [J]. 水力发电学报, 1998, 63(4):86-95.[2] 高金花, 蒋晶, 滕显华. 阶梯溢流坝综述 [J]. 长春工程学院学报(自然科学版), 2004, 11(4):11-15.[3] 张志昌, 曾东洋, 刘亚菲. 台阶式溢洪道掺气特性的试验研究 [J]. 应用力学学报,2003, 20(4):98-100.[4] 汝树勋, 唐朝阳, 梁川. 曲线型阶梯溢流坝坝面掺气发生点位置的确定[J]. 长江科学院院报, 1996, 13(2):7-10.[5] PARSAIE A, HAGHIABI A H. Inception point of flow aeration on quarter-circular crested stepped spillway [J]. Flow Measurement and Instrumentation, 2019, 69(10):16-18.[6] KAOUACHI A, CARVALHO R F, BENMAMAR S, et al. Numerical assessment of the inception point in different stepped spillway configurations [J]. Arabian Journal of Geosciences, 2019, 12(18): 564.[7] SILVESTRI A, ERPICUM S, ARCHAMBEAU P, et al. Stepped spillway downstream of a piano key weir-criticallength for uniform flow [C]//proceedings of the IWLHS 2013-International Workshop on Hydraulic Design of Low-Head Structures, F. 2013.