[1]周琳周,杨雨峤,张海涛,等.闸门关闭速度对竖井贯流泵站停机过程水力特性的影响[J].江苏水利,2025,(10):7-11.
ZHOU Linzhou,YANG Yuqiao,ZHANG Haitao,et al.Influence of gate closing speed on hydraulic characteristics during shutdown process of shaft tubular pumping stations[J].JIANGSU WATER RESOURCES,2025,(10):7-11.
点击复制
闸门关闭速度对竖井贯流泵站停机过程水力特性的影响(
)
《江苏水利》[ISSN:1006-6977/CN:61-1281/TN]
- 卷:
-
- 期数:
-
2025年10期
- 页码:
-
7-11
- 栏目:
-
水利规划与设计
- 出版日期:
-
2025-10-01
文章信息/Info
- Title:
-
Influence of gate closing speed on hydraulic characteristics during shutdown process of shaft tubular pumping stations
- 文章编号:
-
1007-7839(2025)10-0007-0005
- 作者:
-
周琳周1; 杨雨峤2; 张海涛1; 力刚3; 吴玲玲4; 王梦成5
-
(1.江苏省通榆河蔷薇河送清水工程管理处,江苏 淮安 223001;2.江苏省淮沭新河管理处,江苏 淮安 223001;3.江苏省骆运水利工程管理处,江苏 宿迁 223800;4.江苏省水利工程科技咨询股份有限公司,江苏 南京 210000;5.扬州大学 电气与能源动力工程学院,江苏 扬州 225000)
- Author(s):
-
ZHOU Linzhou1; YANG Yuqiao2; ZHANG Haitao1; LI Gang3; WU Lingling4; WANG Mengcheng5
-
(1.Tongyu River and Qiangwei River Water Supply Project Management Office of Jiangsu Province, Huai’an 223001, China; 2.Huaishu NewRiver Management Division of Jiangsu Province, Huai’an 223001, China; 3.Luoyun Hydraulic Project Management Division of Jiangsu Province, Suqian 223800, China; 4.Jiangsu Water Conservancy Engineering Technology Consulting Co., Ltd., Nanjing 210000, China; 5.College of Electrical, Energy and Power Engineering, Yangzhou University, Yangzhou 225000, China)
-
- 关键词:
-
竖井贯流泵站; 停机过程; 闸门速度; 数值模拟; 水力特性
- Keywords:
-
shaft tubular pumping station; shutdown process; gate speed; numerical simulation; hydraulic characteristics
- 分类号:
-
TV131.4
- 文献标志码:
-
B
- 摘要:
-
为揭示竖井贯流泵站停机过程中水力特性变化规律与闸门关闭速度之间的内在联系,以张家港市走马塘江边泵站为研究对象,基于计算流体力学(CFD),通过耦合用户自定义函数(UDF)和动网格技术,对闸门关闭速度分别为30、45和60s时泵站水力过渡过程特性变化规律进行对比分析。结果表明:关机过程中,水泵最大倒转转速、最大倒流流量及达到最大倒流流量的时间均随着闸门关闭时间的增加而增加;而叶轮所受最大水阻力矩和最大轴向力则随着闸门关闭时间的增加而减小,但它们最大值出现时间则随闸门关闭时间的增加而增加。
- Abstract:
-
To reveal the inherent relationship between the hydraulic characteristics changes and the gate closing speed during the shutdown process of the vertical shaft flow pump station, the Zoumatang River side pump station in Zhangjiagang City was taken as the research object. Based on computational fluid dynamics (CFD), by coupling the user-defined function (UDF) and dynamic mesh technology, a comparative analysis was conducted on the variation laws of the hydraulic transient process characteristics of the pumping station when the gate closing speeds were 30, 45, and 60 seconds respectively. The research results indicate that during the shutdown process, the maximum reverse speed, maximum reverse flow rate, and time to reach the maximum reverse flow rate of the water pump all increase with the increase of the gate closing time; The maximum water resistance torque and maximum axial force experienced by the impeller decrease with the increase of gate closing time, but their maximum values appear with the increase of gate closing time.
参考文献/References:
[1]蒋红樱,颜红勤,肖忠明,等. 卧式泵站竖井进水流道三面进水水力特性数值模拟[J]. 排灌机械工程学报,2021,39(10):1008-1013.
[2]张金鹏. 竖井贯流泵站起动过渡过程特性研究[D]. 扬州:扬州大学,2015.
[3]余启清. 贯流式泵站启动过渡过程效能和水力特性分析[J]. 水利技术监督,2020(5):181-183,216.
[4]HANIF M. 实用水力过渡过程[M]. 陈家远,译. 成都:四川水力发电工程学会,1985.
[5]丁浩. 水电站压力引水系统非恒定流[M]. 北京:水利电力出版社,1986.
[6]KAN K,CHEN H,ZHENG Y,et al. Transient characteristics during power-off process in a shaft extension tubular pump by using a suitable numerical model[J]. Renewable Energy,2020,164:109-121.
[7]侯慧敏,马海华,张永明,等. 梯级泵站事故停机输水明渠水力过渡过程研究[J]. 人民黄河,2024,46(10):142-147.
[8]焦海峰. 双向全贯流泵起动与停机过渡过程特性研究[D]. 扬州:扬州大学,2024.
[9]丁征,袁建平,陈颖俊,等. 基于参数分析与智能优化的导叶式混流泵多工况优化[J]. 排灌机械工程学报,2025,43(4):348-356.
[10]徐辉,龚严,曹春建,等. 轴伸贯流泵站全过流系统启动三维过渡过程研究[J]. 农业机械学报,2021,52(4):143-151.
备注/Memo
- 备注/Memo:
-
收稿日期:2025-05-03
基金项目:江苏省高效节能大型轴流泵站工程研究中心开放课题(ECHEAP022)
作者简介:周琳周(1993—),男,工程师,主要从事水利工程运行工作。E-mail: 799481641@qq.com
通信作者:王梦成(1992—),男,讲师,博士,主要从事水泵及水泵站研究。E-mail: jdwmc2018@163.com