大型水上立交工程防淤减淤措施探讨()

《江苏水利》[ISSN:1006-6977/CN:61-1281/TN]

卷:
期数:
2026年04期
页码:
63-68
栏目:
水利工程管理
出版日期:
2026-04-22

文章信息/Info

Title:
Discussion on preventing and reducing sedimentation measures for large scale aqueduct interchange projects
文章编号:
1007-7839(2026)04-0063-0006
作者:
孙超君1孙猛2孙浩晖3韩影1任轶1
1.江苏省水利科教中心,江苏 南京 210029;2.江苏省灌溉总渠管理处,江苏 淮安 223200;3.江苏省水文水资源勘测局,江苏 南京 210029
Author(s):
SUN Chaojun1 SUN Meng2 SUN Haohui3 HAN Ying1 REN Yi1
1.Jiangsu Water Conservancy Science and Education Center, Nanjing 210029, China; 2.General Irrigation Canal Management Office of Jiangsu Province, Huai’an 223200, China; 3.Jiangsu Province Hydrology and Water Resources Investigation Bureau, Nanjing 210029, China
关键词:
工程淤积闸门设置河坡防护数值模型开闸冲淤
Keywords:
engineering siltation gate arrangement river slope protection numerical model gate opening for sediment flushing
分类号:
TV851
文献标志码:
A
摘要:
入海水道大运河立交工程采用“上槽下洞”型式,经工程观测及洞身探查发现地涵管理范围内出现淤积。通过分析洞身淤积形成的原因,针对入海水道立交工程特性、涵洞工程结构水力特性和上游来水偏少这3类淤积产生的主要原因,提出河道滩地迎水侧及滩面防护、河坡防护、工作闸门设置在下游出口位置等工程防淤减淤措施,以及大水头差下开闸冲淤、轮流开启地涵闸门运行、及时开展机械清淤等非工程措施,辅以数值模型对工作闸门设置位置、轮流开启地涵闸门运行等减淤措施的可行性、合理性进行探讨。通过研究水上立交工程淤积的共性规律和防淤减淤途径,为类似工程日常管理提供指导和借鉴。
Abstract:
The Grand Canal Interchange Project on the Inlet Waterway adopts the “upper trough and lower culvert” structure. Through engineering observation and culvert exploration, sedimentation within the culvert management area is identified. After analysis of the causes of culvert sedimentation, engineering measures for preventing and reducing sedimentation are proposed in view of the three main contributing factors: the characteristics of the inlet waterway interchange project, the hydraulic characteristics of the culvert structure, and insufficient upstream inflow. These engineering measures include water-facing side and beach surface protection of river floodplains, river slope protection, and installation of service gates at the downstream outlet. Corresponding non-engineering measures are also put forward, including gate opening for sediment flushing under large water head differences, alternate operation of culvert gates, and timely mechanical dredging. Numerical models are employed to investigate the feasibility and rationality of key sediment reduction measures such as the layout of service gates and alternate operation of culvert gates. Through research on the common characteristics of sedimentation and approaches for sediment prevention and reduction in water interchange projects, guidance and reference are provided for the daily management of similar projects.

参考文献/References:

[1]宋乃聪. 入海水道立交地涵的断面设计[J]. 江苏水利,2001(3):27-28.
[2]孙超君,孙猛,董兆华,等. 涵洞工程洞身段安全诊断技术研究[J]. 江苏水利,2023(10):67-72.
[3]傅朝康,邬旭东,戴秋华. 废黄河立交工程防冲减淤模型试验及数值模拟[J]. 人民长江,2020,51(7):174-180.
[4]李大鸣,范玉,陈海舟. 河口闸下水动力与泥沙清淤问题的研究[J]. 天津大学学报,2005,38(9):817-823.
[5]郑华美,王均明. 苏北沿海挡潮闸闸下水道淤积的因素和影响机制分析[J]. 盐城工学院学报(自然科学版),2005(3):73-76.
[6]张娟,王科亮,夏辉,等. 灌溉总渠河口段挡沙闸选址及优化数值模拟研究[J]. 水利水运工程学报,2025(6):66-74.
[7]王予匀,顾青. 六垛南闸下游引河减淤措施探讨与研究[J]. 水利建设与管理,2021,41(3):9-14.
[8]庄杨,杨超,张兴,等. 基于泥沙动力学分析水利工程调度对改善河道淤积的影响[J]. 江苏水利,2021(10):56-58.
[9]孙洪滨,黄敏,曹恒军,等. 沿海挡潮闸冲淤调度运用关键技术研究[J]. 水利水电技术,2015(3):97-100.

备注/Memo

备注/Memo:
收稿日期:2025-12-04
基金项目:江苏省水利科技项目(2022019)
作者简介:孙超君(1988—),女,高级工程师,硕士,主要从事水利工程管理相关工作。E-mail:490963339@qq.com
更新日期/Last Update: 2026-04-01