[1]陈迪辉,姓海涛,张 敏.基于有限元的高拱坝坝肩稳定分析[J].江苏水利,2017,(03):58-61.
 CHEN Dihui,XING Haitao,ZHANG Min.Abutment stability analysis of high arch dam based on finite element method[J].JIANGSU WATER RESOURCES,2017,(03):58-61.
点击复制

基于有限元的高拱坝坝肩稳定分析()
分享到:

《江苏水利》[ISSN:1006-6977/CN:61-1281/TN]

卷:
期数:
2017年03期
页码:
58-61
栏目:
规划与设计
出版日期:
2017-03-31

文章信息/Info

Title:
Abutment stability analysis of high arch dam based on finite element method
文章编号:
1007-7839(2017)03-0058-04
作者:
陈迪辉12姓海涛3张 敏3
1.河海大学 水文水资源与水利工程科学国家重点实验室,江苏 南京210098;
2.河海大学 水资源高效利用与工程安全国家工程研究中心,江苏 南京210098;
3.南京市溧水区水务局,江苏 南京211200
Author(s):
CHEN Dihui12XING Haitao3ZHANG Min3
1.State Key Laboratory of Hydrology-Water Resources and Hydraulic Engineering,Hohai University,Nanjing 210098,Jiangsu;
2.National Engineering Research Center of Water Resources Efficient Utilization and Engineering Safety,Hohai University,Nanjing 210098,Jiangsu;
3.Water Affair Bureau of Lishui District,Nanjing 211200,Jiangsu
关键词:
高拱坝ABAQUS 有限元分析坝肩稳定刚体极限平衡法
Keywords:
high arch damfinite element methodstability of dam abutmentrigid body limit equilibrium method
分类号:
TV64
文献标志码:
B
摘要:
各类软弱结构面,如断层、煌斑岩脉、层间挤压带、深部裂隙等,会对拱坝坝基及坝肩稳定产生不利影响。本文以某高拱坝为例,通过建立三维有限元模型,研究复杂地质地基条件对大坝应力、位移以及坝肩稳定性的影响。由分析得,在正常蓄水位工况下,位移符合拱坝的一般规律,拉、压应力与容许拉、压应力相比偏大。采用刚体极限平衡法对坝肩进行稳定校核。选取了6 个不同高程的拱圈进行校核,均满足规范要求。
Abstract:
There are many different kinds of weak structural planes in the abutment rock mass like faults,lamprophyre dike,inner layer compressed zone and deep-seated fracture.All of these are disadvantageous to the stability of the dam abutment and foundation.Taken a high arch dam as an example,a three-dimensional finite element model is established to study the efforts of the complex geological conditions of the dam stress,displacement and abutment stability.According to the result,the changes in displacement meet the general law of arch under the working condition of the normal storage level.Tensile stress and compressive stress is larger than the allowable value.Rigid body limit equilibrium method is used to check the stability of the abutment.Six different elevations of the arch are selected.All of them meet the stability requirements.

参考文献/References:

[1]陈秋华,等 .雅砻江锦屏一级水电站可行性研究报告[R] .成都:国家电力公司成都勘测设计研究院,2003:86-100.
[2]宋胜武,向柏宇,等 .锦屏一级水电站复杂地质条件下坝肩高陡边坡稳定性分析及其加固设计[J] .岩石力学与工程学报,2010,19(3):442-458 .
[3]赵玮,李守义 .拱坝三维有限元等效应力计算研究[D] .西安理工大学硕士论文,2007 .
[4]SL282—2003,混凝土拱坝设计规范[S] .

备注/Memo

备注/Memo:
作者简介:陈迪辉(1993-),男,在读硕士,研究方向为水工结构。
更新日期/Last Update: 2017-03-15