[1]倪 春,黄先北*,仇宝云,等.闸门反向挡水时封闭梁格方案对启门力降低效果的研究[J].江苏水利,2020,(12):52-55.
 NI Chun,HAUNG Xianbei*,QIU Baoyun,et al.Study on effect of closed beam grillage scheme on the reduction of opening force by reverse retaining gate[J].JIANGSU WATER RESOURCES,2020,(12):52-55.
点击复制

闸门反向挡水时封闭梁格方案对启门力降低效果的研究()
分享到:

《江苏水利》[ISSN:1006-6977/CN:61-1281/TN]

卷:
期数:
2020年12期
页码:
52-55
栏目:
水利工程建设
出版日期:
2020-12-28

文章信息/Info

Title:
Study on effect of closed beam grillage scheme on the reduction of opening force by reverse retaining gate
文章编号:
1007-7839(2020)12-0052-04
作者:
倪 春1 黄先北2* 仇宝云2 孙 涛1 于贤磊1
1.南水北调东线江苏水源有限责任公司, 江苏 南京 210029; 2.扬州大学 电气与能源动力工程学院, 江苏 扬州 225127
Author(s):
NI Chun1 HAUNG Xianbei2* QIU Baoyun2 SUN Tao1 YU Xianlei1
1.The Eastern Route of South-to-North Water Diversion Project Jiangsu Water Source Co., Ltd., Nanjing 210094,China; 2.College of Electrical, Energy and Power Engineering, Yangzhou University, Yangzhou 225127, China
关键词:
反向挡水闸门 启门力 CFD 封闭梁格
Keywords:
reverse retaining gate opening force CFD closed beam grillage
分类号:
TV663
文献标志码:
B
摘要:
垂直提升式钢闸门反向挡水时,闸门的梁系结构朝向上游侧,由于水流的冲击作用,易导致启闭机的启门力严重不足。为了降低启门力,提出封闭梁格方案,基于CFD方法计算进行了分析,结果表明:闸门底部主梁上下表面压差形成的垂直作用力占水流总垂直作用力的85%~97%,封闭下部梁格与封闭全部梁格方案相比原方案的启门力分别降低15.5%与19.5%,原因在于避免了水流对底部主梁的冲击,降低了水流的垂直作用力。
Abstract:
When the vertical lifting steel gate is blocking the water in reverse, the beam structure of the gate is towards the upstream side. Due to the impact of the water flow, the opening force of the gate hoist is likely to be seriously insufficient. In order to reduce the opening force, a closed beam grillage scheme was proposed and analyzed based on CFD method calculations. The results showed that the vertical force formed by the pressure difference between the upper and lower surfaces of the main beam at the bottom of the gate accounted for 85% to 97% of the total vertical force of the water flow. The opening force of the closed lower girder and the closed all girders were reduced by 15.5% and 19.5% respectively compared with the original scheme. The reason was to avoid the impact of the water flow on the bottom main beam and reduce the vertical force of the water flow.

参考文献/References:

[1] 杨艳军. 某双向挡水节制闸工程的方案设计分析[J]. 水科学与工程技术, 2011(5):43-44.
[2] 刘国瑞. 广西郁江调水工程大雾坪输水渠双向挡水工作闸门设计[J]. 水电站设计, 2011(2):29-34.
[3] 罗灿, 刘超. 多机组泵站侧向进水特性模拟和改进研究[J]. 水力发电学报, 2015, 34(1):207-214.
[4] 林伟栋, 赵西增, 叶洲腾, 等. 涌潮运动的CFD模拟研究[J]. 水动力学研究与进展(A辑), 2017(6):696-703.
[5] HUANG X B,YANG W, LI Y J, et al. Review on the sensitization of turbulence models to rotation/curvature and the application to rotating machinery[J]. Applied Mathematics and Computation, 2019, 341:46-69.
[6] DEMIREL E. Measured and simulated flow downstream of the submerged sluice gate [J]. Water and Environment Journal, 2015(29):446-455.
[7] 黄先北, 郭嫱, 仇宝云. FBM模型在典型分离流动预测中的应用[J]. 华中科技大学学报(自然科学版), 2018, 46(7):52-56.
[8] ALBADAWI A, DONOGHUE D B, ROBINSON A J, et al. Influence of surface tension implementation in volume of fluid and coupled volume of fluid with level set methods for bubble growth and detachment[J]. International Journal of Multiphase Flow, 2013, 53:11-28.

备注/Memo

备注/Memo:
收稿日期:2020-04-25
基金项目:国家自然科学基金(51909231,51679208); 江苏省南水北调工程科技创新项目(SSYXZ-2019-JF68)
作者简介:倪春(1987—),男,工程师,硕士,主要从事水利工程管理工作。E-mail: 492864090@qq.com
通信作者:黄先北(1991—),男,讲师,博士,主要从事水利工程相关研究。E-mail: znhuang@1613.com
更新日期/Last Update: 2020-12-20