[1]陈钟,陈星辰,孙松,等.水管单位安全预防体系动态评估模型建立和应用[J].江苏水利,2022,(12):45-48,57.
 CHEN Zhong,CHEN Xingchen,SUN Song,et al.Establishment and application of dynamic evaluation model of safety prevention system in water management units[J].JIANGSU WATER RESOURCES,2022,(12):45-48,57.
点击复制

水管单位安全预防体系动态评估模型建立和应用()
分享到:

《江苏水利》[ISSN:1006-6977/CN:61-1281/TN]

卷:
期数:
2022年12期
页码:
45-48,57
栏目:
水利工程管理及防汛防旱
出版日期:
2022-12-01

文章信息/Info

Title:
Establishment and application of dynamic evaluation model of safety prevention system in water management units
文章编号:
1007-7839(2022)12-0045-0004
作者:
陈钟陈星辰孙松傅金张杰
(江苏省洪泽湖水利工程管理处,江苏 淮安 223100)
Author(s):
CHEN Zhong CHEN Xingchen SUN Song FU Jin ZHANG Jie
(Jiangsu Hongze Lake Water Conservancy Project Management Office, Huai’an 223100, China)
关键词:
安全预防PDCA循环专家权重风险评价
Keywords:
safety prevention PDCA circulation expert weight vector risk assessment
分类号:
TV698
文献标志码:
A
摘要:
为建立水管单位安全预防体系动态评估模型,引入PDCA循环管理模式,结合石港站工程实际,首先构建“双预防”体系,对挑选出的专家进行权威性判断,得出权向量,再对工程进行风险评价,使用权向量对风险值进行修正,判断出风险因素。同时,引入安全网格化巡查方法,对工程进行隐患排查,筛选出主要隐患,结合风险因素,得出工程主要防控因素,采用对策性鱼骨法对风险因素提出管控措施,最终形成评估模型,为水利工程安全风险评估及隐患排查治理“双预防”机制提供借鉴。
Abstract:
In order to establish the dynamic evaluation model of the safety prevention system of water management units, this paper introduces the PDCA circulation management mode. According to the actual situation of Shigang station project, the “double prevention” system is built at first, the authoritative judgment on the selected experts is made, the weight vector is obtained. Then the project is evaluated for risk, and the risk value is corrected using the weight vector to determine the risk factors. At the same time, the safety grid inspection method is introduced to investigate the hidden dangers of the project and screen out the main hidden danger. Combined with risk factors, resulting in the main prevention and control factors, control measures are proposed to risk factors by using the countermeasure fishbone method, and an assessment model is finally formed, which provide experience and reference for the “double prevention” mechanism of safety risk assessment and hidden danger investigation and treatment of water conservancy projects.

参考文献/References:

[1]朱舟波,王振,唐雨婕,等. 舟山绿色石化基地事故案例分析[J]. 中国安全生产,2021,16(12):68-69.
[2]杨香东,刘大洋,熊壮. 湖北EPC总承包水利项目现场管控的探索与实践[J]. 水利建设与管理,2022,42(1):43-46.
[3]张宇栋,吕淑然,李玉杰. 生产事故隐患排查治理及预警管理信息系统研究[J]. 安全与环境工程,2017,24(2):148-152.
[4]黄萍,徐晶晶. 基于风险偏好信息的企业安全培训质量影响因素评估[J]. 安全与环境工程,2017,24(2):121-125.
[5]曹坤茂,高娜,王理金,等. 基于风险分析的电力企业新业务新业态安全管理模式研究[J]. 中国安全生产科学技术,2022,18(1):201-206.
[6]陈钟,陈星辰,陈凯. 安全生产标准化“1+N”模型的建立与应用[J]. 水利建设与管理,2020,40(5):67-71.
[7]程江洲,朱偲,付文龙,等. 基于贝叶斯网络的水力发电系统动态风险评估方法[J]. 水利学报,2019,50(5):631-640.
[8]金远征,崔守臣,赵礼,等. 基于改进LEC法的水利施工安全风险评估与管控[J]. 人民长江,2018,49(19):63-66.
[9]徐铭,陈凯,施翔,等. 安全生产网格化监管在基层水管单位的应用实践[J]. 江苏水利,2019(12):63-65.
[10]张甲,裴晓. 巴基斯坦码头项目风险管理分析和管理对策分析[J]. 中国设备工程,2021(2):245-246.
[11]秦根泉,田慧,苏晓林. 土坝渗压分析一元线性回归模型构建与应用[J]. 水利建设与管理,2022,42(3):73-80.

备注/Memo

备注/Memo:
收稿日期:2022-09-07
作者简介:陈钟(1989—),男,本科,工程师,主要从事水利工程建设管理工作。E-mail:1071118916@qq.com
更新日期/Last Update: 2022-12-25