[1]徐学东,许兴武,金秋,等.优化营商环境下的生产建设项目水土保持监督管理工作[J].江苏水利,2023,(02):40-43.
XU Xuedong,XU Xingwu,JIN Qiu,et al.Supervision and management of soil and water conservation of production and construction projects under optimal business environment[J].JIANGSU WATER RESOURCES,2023,(02):40-43.
点击复制
优化营商环境下的生产建设项目水土保持监督管理工作()
《江苏水利》[ISSN:1006-6977/CN:61-1281/TN]
- 卷:
-
- 期数:
-
2023年02期
- 页码:
-
40-43
- 栏目:
-
水利信息化
- 出版日期:
-
2023-02-28
文章信息/Info
- Title:
-
Supervision and management of soil and water conservation of production and construction projects under optimal business environment
- 文章编号:
-
1007-7839(2023)02-0040-0004
- 作者:
-
徐学东1; 许兴武1; 金秋2; 卢慧中2; 钱洲1; 朱燕飞1; 张颖泉1
-
(1.南京市水土保持管理中心,江苏 南京 210008;2.南京水利科学研究院 水文水资源与水利工程科学国家重点实验室,江苏 南京 210029)
- Author(s):
-
XU Xuedong1; XU Xingwu1; JIN Qiu2; LU Huizhong2; QIAN Zhou1; ZHU Yanfei1; ZHANG Yingquan1
-
(1.Nanjing Soil and Water Conservation Management Center, Nanjing 210008, China;2.State Key Laboratory of Hydrology-Water Resources and Hydraulic Engineering, Nanjing Hydraulic Research Institute, Nanjing 210029, China)
-
- 关键词:
-
营商环境; 生产建设项目; 水土保持; 监督管理
- Keywords:
-
business environment; production and construction projects; soil and water conservation; supervision and management
- 分类号:
-
S157
- 文献标志码:
-
B
- 摘要:
-
通过分析生产建设项目水土保持现状,提出水行政主管部门应加强水土保持监督管理工作思考,可通过建立与规划和自然资源部门的联动协调机制,在土地开发前组织进行水土保持技术评估,提出水土保持评估意见书;制定生产建设项目水土保持评估技术规范;优化水土保持防治指标;完善水土保持监督管理体系;加强水土保持执法体系建设;取消生产建设项目水土保持方案行政审查等一系列改革举措,进一步优化营商环境。
- Abstract:
-
According to the analysis on the current situation of supervision and management of soil and water conservation of production and construction projects, it is suggested that the water administrative departments should adjust supervision ideas. A series of reform measures can be taken as follows: Water and soil conservation technology assessment should be organized to put forward submit submissions before land development by establishing linkage and coordination mechanisms with planning and natural resources departments. Standards should be developed, meanwhile control targets should be optimized for soil and water conservation evaluation of production and construction projects. Supervision and management system should be improved, and the law enforcement system should be strengthened. The administrative review and comprehensively implement commitment management for water and soil conservation of production and construction projects should be canceled to further optimize the business environment.
参考文献/References:
[1]靳新红. 分阶段编制水土保持方案的建议[J]. 中国水土保持,2021(6):14-17.
[2]国务院. 《关于深化改革严格土地管理的决定》[EB/OL].[2008-03-28]. http://www.gov.cn/zhengce/content/2008-03/28/content_2457.htm.
[3]姜德文. 科学精准高效推进水土保持放管服改革[J]. 中国水利,2021(22):41-43.
[4]江国华,丁安然. “首违不罚”的法理与适用——兼议新 《行政处罚法》第33条第1款之价值取向[J]. 湖北社会科学,2021(3):143-153.
备注/Memo
- 备注/Memo:
-
收稿日期:2022-10-24
基金项目:南京市生产建设项目水土保持监督管理标准化研究(202103)
作者简介:徐学东(1967—),男,工程师,本科,主要从事水土保持监督管理工作。E-mail:454976637@qq.com
更新日期/Last Update:
2023-02-28