相似文献/References:
[1]张 超,洪向华,王海俊.BIM技术在水利工程中的应用实践——以涵闸建模为例[J].江苏水利,2016,(01):63.
[2]沈 乐,杜 勇.长江南京段污染源对饮用水源地的影响及对策[J].江苏水利,2016,(02):28.
SHEN Le,DU Yong.Influence and countermeasures of pollution sources on drinking water source
of the Yangtze River in Nanjing[J].JIANGSU WATER RESOURCES,2016,(10):28.
[3]龙 俊,王 豹,高 亮,等.石港泵站立式轴流泵装置模型试验研究[J].江苏水利,2017,(02):12.
LONG Jun,WANG Bao,GAO Liang,et al.Study on model test of vertical axial-flow pump device of Shigang station[J].JIANGSU WATER RESOURCES,2017,(10):12.
[4]王高旭,吴 巍,张大伟,等.基于GIS 的石梁河水库洪水预报模型研究[J].江苏水利,2017,(08):56.
WANG Gaoxu,WU Wei,ZHANG Dawei,et al.Flood forecast model of Shilianghe reservoir based on GIS[J].JIANGSU WATER RESOURCES,2017,(10):56.
[5]马余良,赵天昌,许攀,等.泗阳闸水力学模型出流能力的分析验证[J].江苏水利,2022,(04):25.
MA Yuliang,ZHAO Tianchang,XU Pan,et al.Analysis and verification of outflow capacity of hydraulic model of Siyang Gate[J].JIANGSU WATER RESOURCES,2022,(10):25.
[6]高志勤.水库流域氮磷排放与入库量评估研究[J].江苏水利,2015,(11):47.