相似文献/References:
[1]崔彩,杨锋鸽.新沟河延伸拓浚工程江边枢纽船闸闸室施工控制[J].江苏水利,2016,(08):20.
CUI Cai,YANG Fengge.Construction control of riverside hub lock chamber in Xingouhe extension
and dredging project[J].JIANGSU WATER RESOURCES,2016,(01):20.
[2]黎龙凤,张志俊.浅谈梯形(T90)预制混凝土田间渠道的
设计及施工工艺[J].江苏水利,2016,(08):47.
LI Longfeng,ZHANG Zhijun.Discussion on the design and construction technology of trapezoidal (T90) precast concrete field channel[J].JIANGSU WATER RESOURCES,2016,(01):47.
[3]姓海涛,张 敏,简泽平.简述大体积水工混凝土浇筑裂缝控制[J].江苏水利,2016,(12):42.
XING Haitao,ZHANG Min,JIAN Zeping.Brief description about the crack control of mass hydraulic concrete casting[J].JIANGSU WATER RESOURCES,2016,(01):42.
[4]潘华炜,周 珺,丁 浩,等.地下连续墙施工过程中的变形控制研究[J].江苏水利,2017,(05):29.
PAN Huawei,ZHOU Jun,DING Hao,et al.Study on deformation control of diaphragm wall during construction[J].JIANGSU WATER RESOURCES,2017,(01):29.
[5]陈锡林,金忠良,陈于,等.装配式生态护岸工程的设计与施工[J].江苏水利,2022,(06):1.
CHEN Xilin,JIN Zhongliang,CHEN Yu,et al.Design and Construction of Prefabricated Ecological Revetment Engineering[J].JIANGSU WATER RESOURCES,2022,(01):1.