相似文献/References:
[1]刘 军,施 伟,徐 磊,等.大型低扬程泵装置水力设计关键技术的创新与发展[J].江苏水利,2021,(12):1.
LIU Jun,SHI Wei,XU Lei,et al.Innovation and development of key technologies for hydraulic design of large scale pump system with low head[J].JIANGSU WATER RESOURCES,2021,(10):1.
[2]仇宝云,方涛,刘木秀,等.大型泵站电机轴承间接供水系统冷却计算与优化运行[J].江苏水利,2022,(03):46.
QIU Baoyun,FANG Tao,LIU Muxiu,et al.Cooling calculation and optimal operation of indirect water supply system for motor bearing in large pumping station[J].JIANGSU WATER RESOURCES,2022,(10):46.
[3]李蕴升,江如春,邱晓侨.大型泵站主机组摆度测量技术探析[J].江苏水利,2022,(08):70.
LI Yunsheng,JIANG Ruchun,Qiu Xiaoqiao.Exploration and analysis of swing measurement technology of main unit of large pumping station[J].JIANGSU WATER RESOURCES,2022,(10):70.
[4]魏伟,潘卫锋.物联网技术在大型泵站工程设备运行管理中的应用[J].江苏水利,2022,(增刊2):38.
WEI Wei,PAN Weifeng.Application of internet of things technology in the operation management of large pumping station engineering equipment[J].JIANGSU WATER RESOURCES,2022,(10):38.
[5]王予匀,左佳佳,周玥涛,等.淮安二站机组测温系统改造[J].江苏水利,2023,(06):66.
WANG Yuyun,ZUO Jiajia,ZHOU Yuetao,et al.Unit transformation of temperature measurement system of Huai’an Second Pump Station[J].JIANGSU WATER RESOURCES,2023,(10):66.