[1]徐朝阳.浅谈高水位复杂地基振动沉管灌注桩常见缺陷及处理措施[J].江苏水利,2016,(12):32-35.
XU Chaoyang.Shallow discussion on common defects and treatment measures of vibration cast-in-place pile under high water level and complex foundation[J].JIANGSU WATER RESOURCES,2016,(12):32-35.
点击复制
浅谈高水位复杂地基振动沉管灌注桩常见缺陷及处理措施()
《江苏水利》[ISSN:1006-6977/CN:61-1281/TN]
- 卷:
-
- 期数:
-
2016年12期
- 页码:
-
32-35
- 栏目:
-
工程建设
- 出版日期:
-
2016-12-15
文章信息/Info
- Title:
-
Shallow discussion on common defects and treatment measures of vibration cast-in-place pile under high water level and complex foundation
- 文章编号:
-
1007-7839(2016)12-0032-04
- 作者:
-
徐朝阳
-
丹阳市九曲河枢纽管理处,江苏 镇江 212322
- Author(s):
-
XU Chaoyang
-
Jiuqu River Project Management Office of Danyang, Zhenjiang 212322, Jiangsu
-
- 关键词:
-
沉管灌注桩; 桩身缩颈; 拔管; 处理措施
- Keywords:
-
cast-in-place pile; pile section reduction; pipe drawing; treat ment measures
- 分类号:
-
TV523
- 文献标志码:
-
B
- 摘要:
-
九曲河水利枢纽地质均为长江冲积平原,由长江泥沙沉积而成,因而具有固结差,土质软,砂性较高等特点。本文分析了在高水位复杂地基振动沉管灌注桩施工中常见的桩身缩颈、断桩、吊脚桩等缺陷形成原因,有针对性地采取了降水处理、消除上下土层条件不同对成桩质量的影响及解决拔管过快问题、消除桩间距过小对成桩质量的影响、配料处理等有效措施,处理措施简便,经济实用,质量有保证,较大地提高了振动沉管灌注桩的优良率。
- Abstract:
-
The Jiuqu River water conservancy geology for Yangtze River alluvial plain, the Yangtze River
sediment deposition and consolidation, which has poor soil soft, sandy higher. This paper analyzes the causes of common pile complex foundation in the high water level vibration cast-in-place pile in construction of necking,broken pile, suspending pile defects have been taken for treatment, eliminate the soil under rainfall conditions of different influence on the pile quality and solve the problem, extubation too fast and effective measures to eliminate the pile the spacing is too small, the influence of the quality of pile batching processing, treatment is simple, economical and practical, quality assurance, greatly improve the excellent rate of vibration cast-inplace pile.
参考文献/References:
[1] 镇江市工程勘察设计勘察院. 湖西引排工程九曲河枢纽工程地质勘察报告[R]. 镇江:镇江市工程勘察设计勘察院,2000.
[2] 张富军,王西岭. 振动沉管灌注桩几个常见质量问题的分析[J]. 黑河科技,2003(1):43-43.
[3] GB50202-2009,建筑地基基础工程施工质量验收规范[S].
[4] 镇江市基础工程检测研究所. 桩基低应变动力检测报告[R]. 镇江:镇江市基础工程检测研究所,2002.
[5] 江苏省工程勘测研究院岩土测试中心. 桩基高应变动力检测报告[R]. 南京:江苏省工程勘测研究院岩土测试中心,2002.
[6] 江苏省水利建设工程质量检测站. 九曲河枢纽闸站与河道水下工程质量检测报告[R]. 南京:江苏省水利建设工程质量检测站,2003.
备注/Memo
- 备注/Memo:
-
作者简介:徐朝阳(1975-),男,工程师,主要从事水利工程管理工作。