[1]张从从,韦爱群,李金宝,等.基于模型试验的导流墩对闸站合建工程通航水流条件的影响研究[J].江苏水利,2019,(04):13-17.
 ZHANG Congcong*,Wei Aiqun,LI Jinbao,et al.Study on the influence of diversion piers on the navigable flow conditions in the joint construction project of sluice and pumping station based on model test[J].JIANGSU WATER RESOURCES,2019,(04):13-17.
点击复制

基于模型试验的导流墩对闸站合建工程通航水流条件的影响研究()
分享到:

《江苏水利》[ISSN:1006-6977/CN:61-1281/TN]

卷:
期数:
2019年04期
页码:
13-17
栏目:
水文水资源
出版日期:
2019-04-15

文章信息/Info

Title:
Study on the influence of diversion piers on the navigable flow conditions in the joint construction project of sluice and pumping station based on model test
文章编号:
1007-7839(2019)04-0013-05
作者:
张从从1 韦爱群2 李金宝1 高 琛3
1.扬州大学水利与能源动力工程学院, 江苏 扬州 225127; 2.江苏省水文水资源勘测局盐城分局, 江苏 盐城 224000; 3.江西省水利规划设计研究院, 江西 南昌 330029
Author(s):
ZHANG Congcong1* Wei Aiqun2 LI Jinbao1 GAO Chen3
1.College of Hydraulic, Energy and Power Engineering, Yangzhou University, Yangzhou 225127, Jiangsu; 2.Yancheng Hydrology and Water Resources Investigation Bureau of Jiangsu Province, Yancheng 224051, Jiangsu; 3.Jiangxi Provincial Water Conservancy Planning and Designing Institute, Nanchang 330029, Jiangxi
关键词:
闸站合建 导流墩 模型试验 水流条件
Keywords:
joint construction of station and pumping station diversion pier model test flow condition
分类号:
TV131.65
文献标志码:
B
摘要:
闸站合建工程在闸行使通航功能时,导流墩附近出现回旋区、斜流等复杂水力现象,影响着船只通航安全性。采用物理模型试验方法对不同方案下的导流墩进行试验,并对试验结果进行分析。试验在自排工况下,设计了6种不同长度、不同开孔参数的导流墩方案对通航口门区水力特性进行研究。试验结果表明:方案4中导流墩适宜长度及开孔参数,可减小导流墩附近回旋区范围及墩头前斜流区,改善口门区水流流态,为通航提供了良好的水流条件,为类似闸站工程通航口门区整流方案提供参考。
Abstract:
Complex hydraulic phenomena, such as circular area and oblique flow, occur near diversion piers in the joint construction of station and pumping station, which affects the navigation safety of ships.The physical model test method was used to test the piers under different schemes, and the test results were analyzed.Under the self-discharging condition, 6 kinds of piers with different length and different opening parameters were designed to study the hydraulic characteristics of navigable port area.The test results showed that the suitable length and opening parameters of the diversion pier in plan 4 could reduce the circle area around the diversion pier and the inclined flow area before the pier head, improve the flow pattern in the mouth area, provide favorable flow conditions for navigation, and provide reference for the rectification scheme of navigable mouth area of similar sluice station engineering.

参考文献/References:

[1] 陆银军, 周伟, 明月敏, 等.基于数值模拟的闸站结合布置优化设计[J].排灌机械工程学报, 2014, 32(11):963-967.
[2] 罗灿, 钱均, 刘超, 等.非对称式闸站结合式泵站前池导流墩整流模拟及试验验证[J].农业工程学报, 2015, 31(07):100-108.
[3] 杨宇, 余之光, 韩昌海, 等.分散式布置枢纽引航道口门区水流条件优化措施[J].水运工程, 2016(12):95-100+112.
[4] 杨文浩, 费晓昕, 张绪进.北江白石窑水利枢纽上游引航道布置及通航条件研究[J].重庆交通大学学报:自然科学版, 2014, 33(01):70-74.[5] 徐波, 张从从, 夏辉, 等.非对称式闸站结合式泵站前池流态模型试验研究[J].水电能源科学, 2018, 36(07):160-162+32.
[6] 李艳, 周勤, 米家杉, 等.瓦村枢纽下游引航道通航水流条件试验研究[J].水运工程, 2018(02):136-141.
[7] Desmukh T S, Gahlot V K.Numerical study of flow behavior in a multiple intake pump sump[J].International Journal of Advanced Engineering Technology, 2011, 2(2):118-128.
[8] 徐进超, 宣国祥, 刘本芹, 等.贵港二线船闸下引航道物理模型试验研究[J].水利水运工程学报, 2017(06):9-13.
[9] 朱卫国, 何贞俊.大藤峡水利枢纽船闸上引航道口门区水流条件模型试验[J].水运工程, 2017(09):137-143.
[10] 宋为威, 逄勇, 宋达昊, 等.淮河入江水道分汊段泄流相互影响的模型试验研究[J/OL].南水北调与水利科技:1-10[2018-10-03].http://kns.cnki.net/kcms/detail/13.1334.TV.20180829.1656.004.html.
[11] 赵明辉, 汤雷, 张建勋, 等.盘龙寺拦河闸枢纽引航道模型试验研究[J].水利水电技术, 2017, 48(12):101-105.
[12] 李君, 赵建钧, 洪娟, 等.船闸凹岸布置上下游引航道水流条件优化[J].水运工程,2016(12):101-105+131.
[13] 王云莉, 孙国栋, 李艳, 等.北江濛里枢纽上游引航道通航水流条件试验研究[J].水运工程, 2016(04):105-112.
[14] 韩春玲, 王修贵, 时述凤.水工模型试验中的相似性定律[J].中国水运:学术版, 2006(10):67-70.
[15] Zhan Jiemin, Wang Bencheng, YU Linghui, et al.Numerical investigation of flow patterns in different pump intake systems[J].Journal of Hydrodynamics, 2012, 24(6):873-882.
[16] 朱红耕, 奚斌.水泵进水池模型试验新方法研究[J].农业机械学报, 2003(05):72-75.
[17] LI Shi-rong, CHENG Wen, WANG Meng, et al.The flow patterns of bubble plume in an MBBR [J].Journal of Hydrodynamics, 2011, 23(4):510-515.

备注/Memo

备注/Memo:
收稿日期:2018-10-21
基金项目:国家自然科学基金青年科学基金项目(51409227,51779215); 江苏省博士后科研资助计划项目(1501115B); 长江科学院开放研究基金资助项目(CKWV2016386/KY); 扬州大学大学生科创基金项目(X20180431)
作者简介:张从从(1993—),男,硕士研究生,研究方向为水工结构工程。
更新日期/Last Update: 2019-04-15