[1]丁志勇,王丽俊,吴利明.浅析泵站流道层混凝土施工防裂措施[J].江苏水利,2019,(06):58-62.
 DING Zhiyong,WANG Lijun,WU Liming.Analysis on the anti-crack measures of the concrete construction in flow runner of the pump station[J].JIANGSU WATER RESOURCES,2019,(06):58-62.
点击复制

浅析泵站流道层混凝土施工防裂措施()
分享到:

《江苏水利》[ISSN:1006-6977/CN:61-1281/TN]

卷:
期数:
2019年06期
页码:
58-62
栏目:
水利工程建设
出版日期:
2019-06-30

文章信息/Info

Title:
Analysis on the anti-crack measures of the concrete construction in flow runner of the pump station
文章编号:
1007-7839(2019)06-0058-05
作者:
丁志勇1 王丽俊2 吴利明3
1.江苏省太湖水利规划设计研究院有限公司, 江苏 苏州 215128; 2.常州市金坛区水利局薛埠水利管理服务站, 江苏 常州 213200; 3.南水北调东线江苏水源有限责任公司宿迁分公司, 江苏 宿迁 223800
Author(s):
DING Zhiyong1 WANG Lijun2 WU Liming3
1.Jiangsu Taihu Planning and Design Institute of Water Resources Co., Ltd., Suzhou 215128, Jiangsu; 2. Xuebu Water Conservancy Management Service Station of Jintan District, Changzhou 213200, Jiangsu; 3. Suqian Branch of Jiangsu Water Source Co., Ltd., of
关键词:
龙山水利枢纽 进出水流道 混凝土裂缝 控制措施
Keywords:
Longshan hydro-junction inflow and outflow runner concrete crack control measures
分类号:
TV544
文献标志码:
B
摘要:
近些年来,江苏水利建设进入了高峰阶段,尤其是大型水利枢纽建设,南水北调东线江苏段、走马塘江边枢纽、新沟河江边枢纽等一大批水利枢纽已建成投入运行。目前新孟河界牌枢纽、奔牛枢纽等大型枢纽工程也已进入施工阶段,对于泵站大体积混凝土施工,尤其是异型结构部位的施工采取措施防止或是减少混凝土裂缝的产生一直是施工的重点、难点。因此,有必要在建设施工的过程中,对防裂措施进行持续不断的总结与研究,最大限度的积累宝贵经验,从而为今后的建设施工提供正确指导。结合常州市金坛区龙山水利枢纽工程的实际施工情况,就泵站流道层混凝土施工防裂措施进行了研究与分析,探讨有效对策。
Abstract:
In recent years, the water conservancy construction of Jiangsu Province has stepped in rapid period, especially in the construction of large water conservancy project. A number of water conservancy project have been placed in service, such as Jiangsu section of South-to-North Water Diversion Project, Zoumatang Riverside Water-control Project, Xingou River Water-control Project. At present, the large water-control projects such as the Jiepai hydro-junction of Xinmeng River and the Benniu hydro-junction had also entered the construction phase. Taking measures to prevent the occurrence of concrete cracks had always been the focus and difficulty in pump station construction, especially the construction of special-shaped structural parts. For the reason, it's necessary to continuously study the anti-crack measures and accumulate valuable experience during the construction process, so as to provide guidance for future water conservancy construction. Based on actual construction of Longshan hydro-junction in Changzhou City, the anti-crack measures of the concrete construction in flow runner of the pump station were studied and analyzed, and effective countermeasures were discussed.

参考文献/References:

[1] 向国剑.大体积混凝土原材料选择及其配合比设计原则[J].四川水利发电, 2010(6):64-65.
[2] DB32/T 3261-2017, 水利工程预拌混凝土应用技术规范 [S].江苏省质量技术监督局, 2017.
[3] GB/T 51033-2014, 水利泵站施工及验收规程[S].中华计划出版社, 2014.

备注/Memo

备注/Memo:
收稿日期:2019-01-02
作者简介:丁志勇(1981—),男,本科,工程师,主要从事水利工程建设管理工作。
更新日期/Last Update: 2019-06-15