[1]卞新盛,吴牧天,王晓森,等.南水北调金湖站抽调水对宝应湖围网养殖区水动力的影响分析[J].江苏水利,2022,(10):18-22.
 BIAN Xinsheng,WU Mutian,WANG Xiaosen,et al.Analysis of the impact of water pumping from Jinhu Pumping Station of South-to-North Water Diversion on the hydrodynamics of the purse seine aquaculture area in Baoying Lake[J].JIANGSU WATER RESOURCES,2022,(10):18-22.
点击复制

南水北调金湖站抽调水对宝应湖围网养殖区水动力的影响分析()
分享到:

《江苏水利》[ISSN:1006-6977/CN:61-1281/TN]

卷:
期数:
2022年10期
页码:
18-22
栏目:
水利规划与设计
出版日期:
2022-11-17

文章信息/Info

Title:
Analysis of the impact of water pumping from Jinhu Pumping Station of South-to-North Water Diversion on the hydrodynamics of the purse seine aquaculture area in Baoying Lake
文章编号:
1007-7839(2022)10-0018-0005
作者:
卞新盛1吴牧天2王晓森1周晨露1
(1.南水北调东线江苏水源有限责任公司,江苏 南京 210029;2.江苏省水利勘测设计研究院有限公司,江苏 扬州 225127)
Author(s):
BIAN Xinsheng1 WU Mutian2 WANG Xiaosen1 ZHOU Chenlu1
(1.The Eastern Route of South-to-North Water Diversion Jiangsu Water Resource Co., Ltd., Nanjing 210029, China;2.Jiangsu Surveying and Design Institute of Water Resources Co., Ltd., Yangzhou 225127, China)
关键词:
南水北调水动力数值模拟金湖泵站
Keywords:
South-to-North water diversion project hydrodynamic numerical simulation Jinhu Pumping Station
分类号:
TV431
文献标志码:
B
摘要:
为研究南水北调金湖站抽调水对宝应湖围网养殖区水动力的影响,通过利用 MIKE21软件构建金湖站站下水域二维水动力模型,设立了设计工况、正常运行工况及多种对比工况,分析站下水域在不同抽水规模、不同初始水位条件下的流速变化情况。通过分析模拟结果可得,抽水引起围网区出现瞬时流速峰值。其中,靠近泵站的围网区口门处流速峰值最大,且抽水规模越大,初始水位越低,围网区瞬时流速峰值越大;通过模拟优化后的泵站运行方案,得出分段开机抽水可有效削弱围网区流速激增的现象。
Abstract:
In order to study the impact of water pumping from Jinhu Station of the South-to-North Water Diversion Project on the hydrodynamics of the purse seine aquaculture area in Baoying Lake, a two-dimensional hydrodynamic model of the water area downstream of Jinhu Station was made by using MIKE21 software. The downstream area of the station was analyzed under various operation schemes with different pumping scales and different initial water levels. By comparing the simulation results, it can be obtained that pumping caused instantaneous flow velocity peaks in the purse seine aquaculture area. Among them, the peak flow velocity at the entrance of the purse seine area close to the pumping station is the largest, and the instantaneous flow velocity peak in the purse seine area is larger when the pumping scale is larger or the initial water level is lower. By simulating the optimized pumping station operation scheme, it can be obtained that turning on the pumping machines at regular intervals instead of turning on all at the same time can effectively weaken the rapid increase in flow velocity in the fence area.

参考文献/References:

[1]黄红虎,谢伟东,张娟. 南水北调东线工程简介[J]. 能源研究与利用,2004(4):3-5.
[2]杨登俊,陈斌,张军,等. 浅谈南水北调金湖站、洪泽站建成后宝应湖地区排涝能力的改变[J]. 江苏水利,2007(11):30-31.
[3]钟开伟,邹燕. 淮河入江水道金湖段阻洪障碍及对策[J]. 江苏水利,2004(9):30-31.
[4]钱程,薛亚锋,于正广,等. 南水北调东线一期金宝航道工程输水线路方案研究[J]. 治淮,2015(7):22-23.
[5]Danish Hydraulic Institute (DHI). MIKE21 Flow Model:Hydrodynamic Module Scientific Documentation[M].Denmark:Danish Hydraulic Institute,2007.
[6]梁云,殷峻暹,祝雪萍,等. MIKE21水动力学模型在洪泽湖水位模拟中的应用[J]. 水电能源科学,2013,31(1):135-137,99.
[7]杨文洲,陆美凝,余敏. 南水北调东线一期金湖泵站流量系数率定分析[J]. 江苏水利,2015(9):24-25.
[8]郝晓珍. 南水北调东线金湖站站内优化运行方法研究[D]. 扬州:扬州大学,2014.
[9]杨登俊,陈斌,张军,等. 浅谈南水北调金湖与洪泽站建成后宝应湖地区防汛排涝能力的改变[J]. 中国防汛抗旱,2007(6):37-41.
[10]黄海田,冯晓莉,谢伟东,等. 南水北调东线江苏境内泵站工程规划设计的优化[J]. 排灌机械,2005(5):23-26.

相似文献/References:

[1]陈亚娟,顾永明.浅谈圆角梯形滚水堰施工技术[J].江苏水利,2016,(05):30.
 CHEN Yajuan,GU Yongming.Discussion on the construction technology of rounded trapezoidal overflow weir[J].JIANGSU WATER RESOURCES,2016,(10):30.
[2]吴春龙,周 静,翟中雷.徐州市尾水导流工程调度运行管理初探[J].江苏水利,2017,(02):41.
 WU Chunlong,ZHOU Jing,ZHAI Zhonglei.Primary study on the operation and management of tail water div ersion project in Xuzhou[J].JIANGSU WATER RESOURCES,2017,(10):41.
[3]黄 炜,杨明非.南水北调东线工程受水区城市水资源配置研究[J].江苏水利,2017,(03):6.
 HUANG Wei,YANG Mingfei.Study on the allocation of urban water resources of water recei ving area within the east route of South to North Water Diversion Project[J].JIANGSU WATER RESOURCES,2017,(10):6.
[4]赵一晗,贺路忠,朱向远.江苏淮北四市尾水导流工程的调查和思考[J].江苏水利,2018,(02):53.
 ZHAO Yihan,He Luzhong,ZHU Xiangyuan.The Investigation and reflection on tail water diversion project of four cities in Huaibei District of Jiangsu[J].JIANGSU WATER RESOURCES,2018,(10):53.
[5]卞新盛,成 立,尚 颖,等.南水北调东线工程省界断面测流方式选择[J].江苏水利,2018,(04):33.
 BIAN Xinsheng,CHENG Li,SHANG Ying,et al.Selection of flow measurement mode in provincial section of South-to-North Water Transfer East Route Project[J].JIANGSU WATER RESOURCES,2018,(10):33.
[6]韩 健.南水北调淮安四站3# 机组大修问题与实施保障[J].江苏水利,2018,(06):46.
 HAN Jian.Study on the overhaul problem and implementation guarantee of Huaian No.4 pumping station 3# unit in South-to-North Water Transfer Project[J].JIANGSU WATER RESOURCES,2018,(10):46.
[7]陈 娟,潘秀华,张正扬.平原地区人工景观湖水动力模型试验与研究[J].江苏水利,2018,(10):34.
 CHEN Juan,PAN Xiuhua,ZHNG Zhengyang.HHydrodynamic model test and research of artificial landscape lake in plain area[J].JIANGSU WATER RESOURCES,2018,(10):34.
[8]胡琦玉,杨金艳,徐 勇,等.典型平原河网地区河道温排水影响研究[J].江苏水利,2018,(10):41.
 HU Qiyu,YANG Jinyan,XU Yong,et al.Study on influence of warm water drainage in typical plain river network region[J].JIANGSU WATER RESOURCES,2018,(10):41.
[9]徐 斌,徐文奕,殷允涛.南水北调刘老涧二站反向发电实践[J].江苏水利,2019,(04):59.
 XU Bin,XU Wenyi,YIN Yuntao.Reverse power generation practice of Liulaojian No.2 Pumping Station in South-to-North Water Diversion Project[J].JIANGSU WATER RESOURCES,2019,(10):59.
[10]莫兆祥,刘 军,周晨露.南水北调东线江苏段泵站工程标准化管理探索实践[J].江苏水利,2020,(06):62.
 MO Zhaoxiang,LIU Jun,ZHOU Chenlu.Exploration and practice on the standardization management in Jiangsu pumping station project of eastern route of south-to-north water diversion project[J].JIANGSU WATER RESOURCES,2020,(10):62.

备注/Memo

备注/Memo:
收稿日期:2022-02-10
作者简介:卞新盛(1987—),男,高级工程师,硕士,主要从事调水工程调度及水量计量工作。Email:100245926@qq.com
更新日期/Last Update: 2022-10-25