相似文献/References:
[1]苏叶春,吴佩锋.ICEM CFD结构化网格在泵站工程中的应用[J].江苏水利,2017,(01):13.
SU Yechun,WU Peifeng.Application of ICEM CFD structured mesh in pump station project[J].JIANGSU WATER RESOURCES,2017,(增刊1):13.
[2]王岩,刘斌,徐立建,等.数字孪生技术与智慧水利枢纽建设思考[J].江苏水利,2022,(增刊2):76.
WANG Yan,LIU Bin,XU Lijian,et al.Thoughts on digital twin technology and construction of smart water conservancy projects[J].JIANGSU WATER RESOURCES,2022,(增刊1):76.
[3]王伟,黄烈涛,刘尚,等.大型泵站枢纽工程风险管控信息系统关键性技术研究[J].江苏水利,2024,(09):38.
WANG Wei,HUANG Lietao,LIU Shang,et al.Research on key technologies of risk management and control information system for large-scale pump station hub projects[J].JIANGSU WATER RESOURCES,2024,(增刊1):38.