[1]李晓慧,黄伯平,李晓东.外高桥电厂隔热导流堤模型试验研究[J].江苏水利,2016,(10):59-63.
 LI Xiaohui,HUANG Boping,LI Xiaodong.Model test study on insulation diversion dikeof Waigaoqiao Power Plant[J].JIANGSU WATER RESOURCES,2016,(10):59-63.
点击复制

外高桥电厂隔热导流堤模型试验研究()
分享到:

《江苏水利》[ISSN:1006-6977/CN:61-1281/TN]

卷:
期数:
2016年10期
页码:
59-63
栏目:
工程管理与防灾减灾
出版日期:
2016-10-15

文章信息/Info

Title:
Model test study on insulation diversion dikeof Waigaoqiao Power Plant
文章编号:
1007-7839(2016)10-0059-05
作者:
李晓慧1黄伯平2李晓东3
1.南京水利科学研究院,江苏南京 210029;
2.五矿建设有限公司,江苏南京 210012;
3.辽宁省交通规划设计院,辽宁沈阳 110166
Author(s):
LI Xiaohui1HUANG Boping2LI Xiaodong3
1. Nanjing Hydraulic Research Institute, Nanjing 210029, Jiangsu;
2. Wukuang ConstructionCo., Ltd, Nanjing 210012, Jiangsu;
3. Liaoning Communications Planning and Design Institute, Shenyang110166, Liaoning
关键词:
泥沙冲淤隔热导流堤物理模型
Keywords:
sediment erosion and deposition insulation diversion dike physical model
分类号:
TV854
文献标志码:
B
摘要:
增设隔热导流堤是解决电厂取水口温升的常见措施。本文针对上海外高桥电厂取排水和码头工程河段进行泥沙物理模型试验,重点研究电厂修建隔热导流堤后的泥沙淤积问题。试验结果表明:码头后方水域泥沙淤积明显分成两个部分,泥沙淤积厚度在隔热导流堤建成后的前两年显著增加,在第三年及第四年后淤积缓慢,滩地地形较为稳定。
Abstract:
Adding insulating dike is a common measure to solve temperature rise of water intake in power plant. In this paper, the sediment physical model test is carried out for the water intake and drainage of the Waigaoqiao Power Plant in Shanghai, and the siltation problem after the construction of the insulation diversion dike is mainly studied. The results show that the siltation in the rear waters of the wharf is clearly divided into two parts. The thickness of siltation is increased significantly in the first two years after the completion of the diversion dike, and the sedimentation is slow in the third and fourth years, with the terrain being relatively stable.

参考文献/References:

[1] 电厂取水防沙防杂物防污情况调研分析总结报告[R].中国电力建设工程咨询公司,2003.
[2] 蒋星科,罗肇森. 外高桥电厂二期工程二维潮流泥沙数学模型计算分析研究[R]. 南京水利科学研究院,2000.
[3] 徐啸. 细颗粒粘性泥沙沉降率的探讨[J]. 水利水运科学研究,1989(4)
[4] 徐啸. 淤泥质海岸河口悬沙回淤模型试验相似率探讨[J]. 河海大学学报,1994(3).
[5] 江苏华电句容发电厂码头及取排水工程泥沙模型试验报告[R]. 长江水利委员会,2007.
[6] 武汉水利电力学院. 河流泥沙工程学[M]. 水利电力出版社,1982.
[7] 罗肇森. 潮汐河口悬沙淤积和局部动床冲淤模型试验[J]. 水利水运科技情报,1977(3).

备注/Memo

备注/Memo:
作者简介:李晓慧(1981-),女,硕士,工程师,主要从事水利水电研究工作。
更新日期/Last Update: 2016-10-15