[1]朱 浩,谭志国,朱春光,等.隧道穿越段长江堤防渗流原因分析及消险加固方案[J].江苏水利,2018,(10):28-33.
 ZHU Hao,TAN Zhiguo,ZHU Chunguang,et al.Causes analysis and reinforcement plan of the Yangtze River embankment seepage on tunnel crossing section[J].JIANGSU WATER RESOURCES,2018,(10):28-33.
点击复制

隧道穿越段长江堤防渗流原因分析及消险加固方案()
分享到:

《江苏水利》[ISSN:1006-6977/CN:61-1281/TN]

卷:
期数:
2018年10期
页码:
28-33
栏目:
工程建设
出版日期:
2018-10-20

文章信息/Info

Title:
Causes analysis and reinforcement plan of the Yangtze River embankment seepage on tunnel crossing section
文章编号:
1007-7839(2018)10-0028-06
作者:
朱 浩1谭志国2朱春光2李 益3
1.南京市水利投资有限公司,江苏 南京 210012;2.南京市长江河道管理处,江苏 南京 210011; 3.南京市滁河河道管理处,江苏 南京 210048
Author(s):
ZHU Hao1TAN Zhiguo2ZHU Chunguang2LI Yi3
1.Nanjing Water Conservancy Investment Co.,Ltd.,Nanjing 210012,Jiangsu; 2.Yangtze River Management Division of Nanjing,Nanjing 210011,Jiangsu; 3.Chuhe River Management Office of Nanjing,Nanjing 210048,Jiangsu
关键词:
隧道堤防渗流消险加固
Keywords:
tunnelembankmentseepagedanger reduction and reinforcement
分类号:
TV871.1
文献标志码:
B
摘要:
某隧道穿越段江堤发生了渗流,通过对地质条件、探测结果等方面的研究,进行渗流产生原因的分析:该段江堤情况复杂,历经多次工程建设,江堤堤身及下部堤基可能受到扰动,堤防土质变松散,形成了渗水通道。结合江堤实际情况,提出了消险加固方案,并进行了多项稳定复核。本案例总结的经验和教训,可为其它类似江堤提供经验和参考。
Abstract:
The seepage happened in the embankment of a tunnel crossing section.Through the study of geological conditions and detection results, the causes of seepage were analyzed.The embankment conditions in this section were complicated, and the embankment body and the lower embankment foundation might be disturbed after many construction projects.The soil quality of the embankment became loose and the seepage channel was formed.Combined with the actual situation of the river embankment, a scheme for eliminating danger and strengthening was put forward, and a number of stability checks were carried out.The experience and lessons learned from this case could provide experience and reference for other similar river embankments.

参考文献/References:

[1] 李铭华,陈辉,方绪顺,等.南师附中树人学校段江堤渗流监测成果分析[J].江苏水利,2018(7):29-33.
[2] 尤红梅.刍议江堤防加固工程中防渗技术的选择与应用[J].建材发展导向,2011(11):143-144.
[3] 卢伟华.黄浦江市区段防汛墙稳定性分析[J].城市道桥与防洪,2015(7):141-144.
[4] 张家发,孙厚才,杨金忠.堤防加固工程中与防渗墙有关问题的研究报告[R].武汉:长江科学院,2001.

相似文献/References:

[1]胡峥嵘,张胤,吴利华.万寿河除险加固分析及治理方案比选[J].江苏水利,2016,(10):18.
 HU Zhengrong,ZHANG Yin,WU Lihua.Analysis of reinforcement and control scheme selection of WanshouRiver[J].JIANGSU WATER RESOURCES,2016,(10):18.
[2]徐 铭,刘洪林,陈 凯.堤防工程精细化管理浅析[J].江苏水利,2018,(08):38.
 XU Ming,LIU Honglin,CHEN Kai.Analysis on fine management of embankment engineering[J].JIANGSU WATER RESOURCES,2018,(10):38.
[3]张 松,张新喜,钱 军.工程地质雷达检测技术在扬州长江堤防加固工程中的应用[J].江苏水利,2019,(01):12.
 ZHANG Song,ZHANG Xinxi,QIAN Jun.Application of engineering geological radar detection technology in Yangzhou Yangtze River embankment reinforcement project[J].JIANGSU WATER RESOURCES,2019,(10):12.
[4]陈 娟,马素俊,潘 盼.长江堤防防渗处理方案优选[J].江苏水利,2019,(03):61.
 CHEN Juan,MA Sujun,PAN Pan.Optimization of anti-seepage treatment plan for Yangtze River embankment[J].JIANGSU WATER RESOURCES,2019,(10):61.
[5]祁卫军,朱家胜,崔阳,等.高压旋喷桩施工过程中桩身开裂原因[J].江苏水利,2022,(05):32.
 QI Weijun,ZHU Jiashen,CUI Yang,et al.Analysis of crack of high-pressure rotating jet grouting pile in levee anti-seepage engineering[J].JIANGSU WATER RESOURCES,2022,(10):32.
[6]徐兰玉,张波,杨浩东.堤防险情隐患快速巡查系统研究与设计[J].江苏水利,2023,(09):55.
 XU Lanyu,ZHANG Bo,YANG Haodong.Research and design of a rapid patrol system for embankment hazards and hidden dangers[J].JIANGSU WATER RESOURCES,2023,(10):55.
[7]吴世新,郭炜.高压旋喷防渗墙在江都区高水河东堤除险加固中的应用[J].江苏水利,2023,(12):51.
 WU Shixin,GUO Wei.Application of high pressure rotary jet anti-seepage wall in the reinforcement of the east embankment of Gaoshui River in Jiangdu District[J].JIANGSU WATER RESOURCES,2023,(10):51.
[8]徐俊,翟铎,朱如东,等.堤防工程自动化安全监测研究[J].江苏水利,2024,(02):50.
 XU JUN,ZHAI Duo,ZHU Rudong,et al.Research on automatic safety monitoring of embankment engineering[J].JIANGSU WATER RESOURCES,2024,(10):50.

备注/Memo

备注/Memo:
收稿日期:2018-09-03
作者简介:朱浩(1986—),男,工程师,主要从事水利工程建设和管理工作。
更新日期/Last Update: 2018-10-15