[1]吴良宇,蔡志刚,徐川江,等.皂河站液压减载装置改造探析[J].江苏水利,2019,(12):44-46+50.
 WU Liangyu,CAI Zhigang,XU Chuanjiang,et al.Exploration and analysis on the transformation of hydraulic load reduction device in Zao River Pumping Station[J].JIANGSU WATER RESOURCES,2019,(12):44-46+50.
点击复制

皂河站液压减载装置改造探析()
分享到:

《江苏水利》[ISSN:1006-6977/CN:61-1281/TN]

卷:
期数:
2019年12期
页码:
44-46+50
栏目:
水利工程管理及防汛防旱
出版日期:
2019-12-20

文章信息/Info

Title:
Exploration and analysis on the transformation of hydraulic load reduction device in Zao River Pumping Station
文章编号:
1007-7839(2019)12-0044-03
作者:
吴良宇 蔡志刚 徐川江 卓 南
江苏省骆运水利工程管理处, 江苏 宿迁 223800
Author(s):
WU Liangyu CAI Zhigang XU Chuanjiang ZHUO Nan
Luoyun Hydraulic Project Management Division of Jiangsu Province, Suqian 223800, Jiangsu
关键词:
电机 推力瓦 液压减载 改造
Keywords:
motor thrust pad hydraulic load reduction transformation
分类号:
TV131.66
文献标志码:
B
摘要:
液压减载装置在皂河站机组运行中有着重要的作用,经过改造不仅解决了长期存在的渗漏油问题,也方便了各推力瓦压力的读取。机组顶升试验表明在2.5 MPa压力时,可以满足油膜厚度要求,建议液压减载装置在运行时压力控制在2.5~3.0 MPa之间,这样可以减小压力过大造成渗漏油的风险。
Abstract:
The hydraulic load reduction device played an important role in the operation of the unit of Zao River Station. The transformation not only solved the problem of long-term leakage oil, but also facilitated the reading of the pressure of each thrust tile. The lifting test of the unit showed that the oil film thickness could be satisfied under the 2.5MPa pressure. It was suggested that the pressure of the hydraulic load reduction device should be controlled between 2.5-3.0MPa during operation, so that the risk of oil leakage caused by excessive pressure could be reduced.

参考文献/References:

[1] 周潘昌. 液压减载装置的安装与使用[J]. 水电机电安装技术, 1981(1):28-34.
[2] 天津发电设备厂. 推力轴承液压减载装置及中心支撑的设计和运行[J]. 大电机技术, 1976(Z1):51-61.
[3] 天津永特天控水电技术有限公司. GDY—20/6.0—12D型高压顶起装置说明书[Z]. 2017.
[4] 吴良宇, 仝超, 徐川江. 皂河站主机组更新改造探析[J]. 江苏水利, 2018(12):60-64.

相似文献/References:

[1]杜晓磊.水闸闸门启闭电动机启动改进与探究[J].江苏水利,2018,(03):52.
 DU Xiaolei.Improvement and exploration of starting and closing of sluice gate motor[J].JIANGSU WATER RESOURCES,2018,(12):52.
[2]吴良宇,仝 超,徐川江.皂河站主机组更新改造探析[J].江苏水利,2018,(12):60.
 WU Liangyu,TONG Chao,XU Chuanjiang.Exploration and analysis on the renewal and transformation of the main unitof Zao River Pumping Station[J].JIANGSU WATER RESOURCES,2018,(12):60.
[3]吴良宇,徐川江,季炜理,等.皂河站主电机定子线圈绝缘损伤的处理[J].江苏水利,2022,(02):62.
 WU Liangyu,XU Chuanjiang,JI Weili,et al.Treatment of stator coil insulation damage of main motor in Zaohe Pumping Station[J].JIANGSU WATER RESOURCES,2022,(12):62.

备注/Memo

备注/Memo:
收稿日期:2019-04-23
作者简介:吴良宇(1972-),男,本科,高级工程师,主要从事泵站运行和管理工作。
更新日期/Last Update: 2019-12-20