相似文献/References:
[1]王继光,钟恒昌,张海虹.灌注桩与搅拌桩组合支护
在大浦第二抽水站基坑支护中的应用[J].江苏水利,2016,(06):19.
WANG Jiguang,ZHONG Hengchang,ZHANG Haihong.Application of combined support with bored pile and mixing pile to foundation
pit support of Dapu second pumping station[J].JIANGSU WATER RESOURCES,2016,(08):19.
[2]胡爱龙.改进型SMW 工法在九乡河闸站工程基坑中的应用[J].江苏水利,2017,(10):63.
HU Ai'long.The improved SMW construction method applied in the foundation pit engineering of Jiuxiang River Gate Station[J].JIANGSU WATER RESOURCES,2017,(08):63.
[3]周建方,张木云,郦华,等.双排钢板桩在高边坡基坑支护中的数值分析[J].江苏水利,2022,(11):9.
ZHOU Jianfang,ZHANG Muyun,LI Hua,et al.Numerical analysis of double rows steel sheet piles in high-slope foundation pit support[J].JIANGSU WATER RESOURCES,2022,(08):9.