相似文献/References:
[1]龚丽飞,朱玲.真空预压处理新近吹填淤泥土设计与施工要点浅析[J].江苏水利,2015,(10):31.
[2]龚丽飞,朱玲.真空预压处理新近吹填淤泥土设计与施工要点浅析[J].江苏水利,2015,(11):31.
[3]宗 姗.淮河入江水道运河西堤崇湾段变真空预压排水固结技术试验研究[J].江苏水利,2016,(04):10.
ZONG Shan.Experimental study on drainage consolidation technology with variable vacuum preloading at Chongwan section of Huaihe-into-Yangtze River watercourse[J].JIANGSU WATER RESOURCES,2016,(09):10.
[4]杨卫星,江季忠.南通市九圩港提水泵站工程
深基坑开挖及降水施工分析与探讨[J].江苏水利,2016,(07):5.
YANG Weixing,JIANG Jizhong.Analysis and discussion on deep foundation pit excavation and dewatering
construction of Jiuweigang pumping station project in Nantong[J].JIANGSU WATER RESOURCES,2016,(09):5.
[5]冯哲源,陶小玉,徐桂中,等.稻秸秆绳排水体真空固结处理高含水率疏浚淤泥可行性研究[J].江苏水利,2020,(07):56.
FENG Zheyuan,TAO Xiaoyu,XU Guizhong,et al.Feasibility study on dredged silt with high moisture content treated by vacuum consolidation of straw rope drainage water body[J].JIANGSU WATER RESOURCES,2020,(09):56.
[6]王山,梁广雪,陈先勇,等.真空预压处理高含水率疏浚泥室内足尺大模型试验研究[J].江苏水利,2022,(12):1.
WANG Shan,LIANG Guangxue,CHEN Xianyong,et al.Full-scale model test on dredged clay at high water content treated by vacuum preloading[J].JIANGSU WATER RESOURCES,2022,(09):1.