[1]吴良宇,仝 超,徐川江.皂河站主机组更新改造探析[J].江苏水利,2018,(12):60-64.
 WU Liangyu,TONG Chao,XU Chuanjiang.Exploration and analysis on the renewal and transformation of the main unitof Zao River Pumping Station[J].JIANGSU WATER RESOURCES,2018,(12):60-64.
点击复制

皂河站主机组更新改造探析()
分享到:

《江苏水利》[ISSN:1006-6977/CN:61-1281/TN]

卷:
期数:
2018年12期
页码:
60-64
栏目:
水利工程及河湖管理
出版日期:
2018-12-28

文章信息/Info

Title:
Exploration and analysis on the renewal and transformation of the main unit of Zao River Pumping Station
文章编号:
1007-7839(2018)12-0060-05
作者:
吴良宇仝 超徐川江
江苏省骆运水利工程管理处,江苏 宿迁 223800
Author(s):
WU LiangyuTONG ChaoXU Chuanjiang
Luoyun Hydraulic Project Management Division of Jiangsu Province,Suqian 223800,Jiangsu
关键词:
电机线圈水泵叶片改造
Keywords:
motorcoilwater pumpbladetransformation
分类号:
TV122
文献标志码:
B
摘要:
皂河站经过多年运行,电机绝缘老化严重,水泵长期处于低效区运行,出现叶片汽蚀严重、转叶油缸和叶轮头漏油等,2004年安全鉴定为三类设备,2台机组于2010~2012年进行更新改造,在改造中对电机定转子线圈进行现场更换,对水泵模型、叶片、转叶油缸、密封等进行优化改造,效果良好,运行稳定。
Abstract:
After years of operation, the motor of Zao River Pumping Station was insulation aging seriously, and the pump was running in the inefficient zone for a long time, which appeared the problems of serious blade erosion, oil leakage in the rotating cylinder and impeller head.In 2004, the equipment was identified as three types of equipment in the safety appraisal, and two units were upgraded from 2010 to 2012.The stator and rotor coils of the motor were replaced on site, and the pump model, blade, rotary vane cylinder, seal, etc.had been optimized and improved with good effect and stable operation.

参考文献/References:

[1] GB8564-88 水轮发电机组安装技术规范[S].北京:水利电力出版社,1988.
[2] 储训,陈履.大型泵站建设和更新改造对策[M].南京:河海大学出版社,2000.
[3] 吴良宇,徐川江,刘刚.电机线圈现场装配及绝缘处理[J].设备管理与维修,2017(12):85-86.
[4] 水利部.南水北调工程总体规划[R].2002.
[5] 水利部淮河水利委员会,水利部海河水利委员会.南水北调东线工程规划(2001年修订)[R].2002.

相似文献/References:

[1]杜晓磊.水闸闸门启闭电动机启动改进与探究[J].江苏水利,2018,(03):52.
 DU Xiaolei.Improvement and exploration of starting and closing of sluice gate motor[J].JIANGSU WATER RESOURCES,2018,(12):52.
[2]吴良宇,蔡志刚,徐川江,等.皂河站液压减载装置改造探析[J].江苏水利,2019,(12):44.
 WU Liangyu,CAI Zhigang,XU Chuanjiang,et al.Exploration and analysis on the transformation of hydraulic load reduction device in Zao River Pumping Station[J].JIANGSU WATER RESOURCES,2019,(12):44.
[3]吴良宇,徐川江,季炜理,等.皂河站主电机定子线圈绝缘损伤的处理[J].江苏水利,2022,(02):62.
 WU Liangyu,XU Chuanjiang,JI Weili,et al.Treatment of stator coil insulation damage of main motor in Zaohe Pumping Station[J].JIANGSU WATER RESOURCES,2022,(12):62.

备注/Memo

备注/Memo:
收稿日期:2018-04-21
作者简介:吴良宇(1972—),男,本科,工程师,主要从事泵站运行和管理工作。
更新日期/Last Update: 2018-12-15