相似文献/References:
[1]王重工,郑春锋.太浦闸拆除重建工程规模分析[J].江苏水利,2016,(08):24.
WANG Chonggong,ZHENG Chunfeng.Analysis of reconstruction scale in Taipu sluice project[J].JIANGSU WATER RESOURCES,2016,(04):24.
[2]胡峥嵘,张胤,吴利华.万寿河除险加固分析及治理方案比选[J].江苏水利,2016,(10):18.
HU Zhengrong,ZHANG Yin,WU Lihua.Analysis of reinforcement and control scheme selection of WanshouRiver[J].JIANGSU WATER RESOURCES,2016,(04):18.
[3]咸国盛,张大伟.小型水库病害特点及除险加固措施浅析[J].江苏水利,2016,(10):64.
XIAN Guosheng,ZHANG Dawei.Brief analysis of reinforcement measures and disease characteristics of small reservoirs[J].JIANGSU WATER RESOURCES,2016,(04):64.
[4]陈张勇.榆次区河口水库除险加固措施初探[J].江苏水利,2017,(07):57.
CHEN Zhangyong.Preliminary study on reinforcement measures of Hekou reservoir in Yuci District[J].JIANGSU WATER RESOURCES,2017,(04):57.
[5]周和平,陆美凝,严凯,等.采用锚杆增强三河闸抗滑稳定技术研究[J].江苏水利,2023,(02):9.
ZHOU Heping,LU Meining,YAN Kai,et al.Research on the technology of enhancing anti-sliding stability of Sanhe Sluice with anchor bolt[J].JIANGSU WATER RESOURCES,2023,(04):9.
[6]张浩,康飞,吴凯,等.九里河姚巷荡排涝站段堤防应急除险加固工程处理[J].江苏水利,2023,(10):35.
ZHANG Hao,KANG Fei,WU Kai,et al.Treatment of emergency relief and reinforcement engineering for the embankment of the Yaoxiangtang drainage station in Jiulihe River[J].JIANGSU WATER RESOURCES,2023,(04):35.