[1]单体伟,周 扬,王 强.钢板桩静压法施工在新沟河工程的应用[J].江苏水利,2020,(增刊2):41-44.
 SHAN Tiwei,ZHOU Yang,WANG Qiang.Application of steel sheet pile static pressure construction in Xingou River Project[J].JIANGSU WATER RESOURCES,2020,(增刊2):41-44.
点击复制

钢板桩静压法施工在新沟河工程的应用()
分享到:

《江苏水利》[ISSN:1006-6977/CN:61-1281/TN]

卷:
期数:
2020年增刊2
页码:
41-44
栏目:
水利工程建设
出版日期:
2021-01-30

文章信息/Info

Title:
Application of steel sheet pile static pressure construction in Xingou River Project
文章编号:
1007-7839(2020)S2-0041-04
作者:
单体伟1 周 扬1 王 强2
1.江苏省水利建设工程有限公司, 江苏 扬州 225000; 2.常州市水利投资公司, 江苏 常州 213001
Author(s):
SHAN Tiwei ZHOU Yang WANG Qiang
1.Jiangsu Hydraulic Engineering Construction Co., Ltd., Yangzhou 225000, China; 2.Changzhou Water Conservancy Construction Investment and Development Co., Ltd., Changzhou 213001, China
关键词:
钢板桩 静压法 设备比选 施工方法 新沟河
Keywords:
steel sheet pile static pressure method equipment selection construction method Xingou River
分类号:
TV265
文献标志码:
B
摘要:
新沟河延伸拓浚工程常州市天宁区境内河道工程河道V标工程采用钢板桩和囊式扩大头锚索组合结构设计护岸,该工程位于常州市天宁区新沟河西岸,紧靠焦粮公路,公路沿线工厂和农村居民房屋众多,施工期间要求新沟河不断航、公路不断交通。做传统的护岸挡墙,河堤紧靠公路边、居民住地,原河岸线路长、场地狭小,土方不能大面积开挖,所以选用U型钢板桩做永久护岸,钢板桩顶部浇筑钢筋混凝土挡土墙加拉锚结构。钢板桩施工不能振动,为了避免周边建筑物振动影响,采用静压打桩机,减少干扰,缩短工期、施工质量得到保证。
Abstract:
The river course V standard project of Xingou River extension dredging project in Tianning District, Changzhou City, adopted a combination structure bank protection type of steel sheet pile and anchor cable with capsule extension head. The project is located in the west bank of Xingou River, Tianning District, Changzhou City, close to Jiaoliang Road, along which there were many factories and rural residential houses. During the construction period, Xingou River was required to be continuously navigable and highways to be continuously trafficked. As a traditional revetment retaining wall, the embankment was close to the highway and the residential area, the original riverbank line was long and the site was narrow, the earthwork couldn't be excavated in a large area, therefore, the U-shaped steel sheet pile was chosen as the permanent revetment, and the steel sheet pile top was cast into the reinforced concrete retaining wall with anchor structure. Steel sheet pile construction could not be vibrated, in order to avoid the vibration of surrounding buildings, static pressure pile driver was adopted to reduce interference, shorten the construction period, and ensure the construction quality.

参考文献/References:

[1] DB32/T 2334—2013, 水利工程施工质量检验与评定规范[S].
[2] JTS257-2008, 水运工程质量检验标准[S].
[3] GB/T 29654-2013, 冷弯钢板桩[S].

相似文献/References:

[1]邱乾勇,蔡慧娟,汪庆发.钢板桩防渗墙在新禹河闸除险加固工程中的应用[J].江苏水利,2016,(12):28.
 QIU Qianyong,CAI Huijuan,WANG Qingfa.The application of steel sheet pile cutoff wall in Xinyuhe sluice reinforcement project[J].JIANGSU WATER RESOURCES,2016,(增刊2):28.
[2]王 强,周 扬.钢板桩和扩大头锚索组合结构在河道驳岸设计的应用[J].江苏水利,2020,(增刊2):34.
 WANG Qiang,ZHOU Yang.Application of combined structure of steel sheet pile and anchor cable with extension head in river revetment design[J].JIANGSU WATER RESOURCES,2020,(增刊2):34.
[3]周成洋,袁聪,林立.钢板桩围堰技术在沿海淤泥质土中的应用[J].江苏水利,2022,(03):19.
 ZHOU Chengyang,YUAN Cong,LIN Li.Application of steel sheet pile cofferdam technology in coastal muddy soil[J].JIANGSU WATER RESOURCES,2022,(增刊2):19.
[4]周建方,张木云,郦华,等.双排钢板桩在高边坡基坑支护中的数值分析[J].江苏水利,2022,(11):9.
 ZHOU Jianfang,ZHANG Muyun,LI Hua,et al.Numerical analysis of double rows steel sheet piles in high-slope foundation pit support[J].JIANGSU WATER RESOURCES,2022,(增刊2):9.

备注/Memo

备注/Memo:
收稿日期:2020-07-06
作者简介:单体伟(1986—),男,高级工程师,主要从事水利工程建设施工管理工作。
更新日期/Last Update: 2020-12-30